Scope of Work: Piping work in the building related to plumbing, water supply and active fire protection system for the building. Copper pipe installation within the building for Air-condition system. Electrical installation work such as the connecting the electrical cable between the Electrical Transformer and the Main Distribution Board (MDB).
Project Starting : 2018
Project End : 2019
Category : MEP Infrastructure Work